Six Photos: The slab for the upper "future stadium restroom" was just poured this morning.
The lower ramps and stairs are being poured today too.
They started on the west side with the concrete ramp and walkway and worked their way east.
One of the several "sets of steps" that will lead from the ramp area to the "stadium seats".
This is what you really call "ankle deep in mud".
The "steel workers" are installing the "ridge cap" to the roof of the Concession & Maintenance Building.