The Earth-mover is now the machine of choice to cut the last of the "grandstand hill" to grade. The retaining wall at right is now over 10' tall.
The wall now represents two of four lifts which will make this verticle face 16'-10" tall, when done.
See how the lower blade of the Earth-mover cuts the soil and the "conveyor-blades" lift the fresh cut earth to the rear of the bed.
The new Stadium Roof steel arrived from Texas yesterday. Material includes "verticle supports", "roof girders" and "steel sheet roofing".