These huge "concrete light poles" from the original Field 1 were donated, by Starfire Sports, to a local church.
The last "lift" section is being prepared for its concrete face.
The man standing (with the blue shirt) uses a laser guided level, to help these workers set and tie off the 1/4" wire mesh and 1/2" rebar.
Atop the "grandstand hill" (looking west) where the steel standium roof is next to be erected.
Please Read, Terms of Use and Copyright