The new "grandstand roof" is nearly ready for the "steel roofing sheets".
The old concrete wall and ramp have been demolished and the "footing work" for the new restrooms and concessions are under way.
The last section of steel facia for the east side of the stadium roof is being installed.
A utility line trench is being dug behind the new retaining wall.