Six Photos Today. The "western retaining wall" is poured and stripped. The ground area here will have an asphalt walk-way.
The "artificial rug" is being laid down on Field #4. Fields #3 & #4 run "north and south".
A view of the work on Field #4 from the back of the Grandstands
The work-crew from Field Turf, Inc., is stretching the 4th section of "rug", atop of the 3rd section.
One more "utility trench" is being dug between Field #2 and the Concession & Maintenance Building.
Over on the concrete slab of the Athletic Center Building, a mini loader and a pile of granulated rubber are staged.