The original "sand field", Field #1, has all of the drainage lines in and is now getting its 6" of "sub-base rock".
Looking north at Field #4 from the east side of the stadium, the workers from Field Turf, Inc., are in-laying the "center circle".
Field #3 is getting its "final rock layer" compacted with this heavy roller machine.
From the back of the grandstands, Field #4 is coming to life.
Another view of the "roller" (from the grandstands) compacting the final rock layer of Field #3.
All of the "soccer field materials" staged on the concrete slab of the Athletic Center Building.