Six Photos: The "asphalt walkway" on the west side of Field #2 is being laid down today.
The crew from Field Turf, Inc., is nearly done with Fields #3 and #4.
Field #4. The "granulated rubber and sand surface" is about 3/4ths complete on Fields #3 and #4.
Looking at Fields #3 and #4 from the "upper east corner" of the grandstands.
Another view of Fields #3 and #4 from the "upper east corner" of the grandstands.
Field #4 again, from the "upper east corner" of the grandstands.