Here is a "surface water drain" that was just installed on the north-east side of the Athletic Center Building.
This new "man-hole" is still receiving new waste-water & surface-water lines.
This "electrical vault" will house many electrical conduit connections.
In the far north-east corner of the new soccer fields 3 & 4, stands this new "soil retaining wall".
Please Read, Terms of Use and Copyright