The small "topping rock" for the sub-base on Field #2 is nearly done.
You can clearly see the size differance of the base rock between the lower and upper levels.
The "laser guided leveling system" indicates to the grader just how low the blade should be set.
Back in the southwest corner of Field #2, a roller is compacting the the final sub-base layer. Next week, the artificial surface will be laid.